| Nr. |
Works and resource name |
Measures |
Quantity (enter) |
Price |
Sum |
Info |
| 1 |
Installation of foundation (piles) |
m3 |
|
|
|
|
| 2 |
Installation of foundation (polar belt) |
m3 |
|
|
|
|
| 3 |
Installation of foundation (assembled) |
m3 |
|
|
|
|
| 4 |
Installation of foundation (grillage) |
m3 |
|
|
|
|
| 5 |
Installation of hydro isolation of foundation |
m2 |
|
|
|
|
| 6 |
Installation of thermal insulation of foundation |
m2 |
|
|
|
|
| 7 |
Brickwork (ceramic blocks) |
m3 |
|
|
|
|
| 8 |
Brickwork (ceramsite-concrete blocks) |
m3 |
|
|
|
|
| 9 |
Brickwork (silicate blocks) |
m3 |
|
|
|
|
| 10 |
Brickwork (spongy concrete blocks) |
m3 |
|
|
|
|
| 11 |
Brickwork (silicate bricks) |
m3 |
|
|
|
|
| 12 |
Brickwork (clinker bricks) |
m2 |
|
|
|
|
| 13 |
Brickwork (ceramic bricks) |
m3 |
|
|
|
|
| 14 |
Wall installation (monolith) |
m3 |
|
|
|
|
| 15 |
Wall installation (timber 160 mm) |
m2 |
|
|
|
|
| 16 |
Wall installation (timber 190 mm) |
m2 |
|
|
|
|
| 17 |
Wall installation (timber 240 mm) |
m2 |
|
|
|
|
| 18 |
Wall installation (framework) |
m3 |
|
|
|
|
| 19 |
Brickwork of partitions (blocks) |
m2 |
|
|
|
|
| 20 |
Brickwork of partitions (bricks) |
m2 |
|
|
|
|
| 21 |
Installation of partitions (monolith) |
m3 |
|
|
|
|
| 22 |
Installation of partitions (timber 160 mm) |
m2 |
|
|
|
|
| 23 |
Installation of partitions (frame 100 mm) |
m2 |
|
|
|
|
| 24 |
Installation of partitions (glass 10 mm) |
m2 |
|
|
|
|
| 25 |
Installation of partition’s frame (Plaster pasteboard) |
m2 |
|
|
|
|
| 26 |
Assembly of lintels (reinforced concrete assembled up to 100 kg) |
unit |
|
|
|
|
| 27 |
Assembly of lintels (reinforced concrete assembled over 100 kg) |
unit |
|
|
|
|
| 28 |
Assembly of lintels (metal, up to 100 kg) |
unit |
|
|
|
|
| 29 |
Assembly of lintels (metal, over 100 kg) |
unit |
|
|
|
|
| 30 |
Installation of lintels (monolith) |
m3 |
|
|
|
|
| 31 |
Installation of diaphragm (monolith) |
m3 |
|
|
|
|
| 32 |
Installation of diaphragm (concrete panel) |
m2 |
|
|
|
|
| 33 |
Installation of diaphragm (wood) |
m2 |
|
|
|
|
| 34 |
Assembly of beams |
m |
|
|
|
|
| 35 |
Assembly of joists |
m2 |
|
|
|
|
| 36 |
Installation of roof thermal insulation (sloped) |
m3 |
|
|
|
|
| 37 |
Installation of roof thermal insulation (flat) |
m3 |
|
|
|
|
| 38 |
Assembly of laths (beams) |
m2 |
|
|
|
|
| 39 |
Assembly of laths (OSB) |
m2 |
|
|
|
|
| 40 |
Assembly of roofing (steely) |
m2 |
|
|
|
|
| 41 |
Assembly of roofing (ceramic tiles) |
m2 |
|
|
|
|
| 42 |
Assembly of roofing (bituminous tiles) |
m2 |
|
|
|
|
| 43 |
Assembly of roofing (concrete tiles) |
m2 |
|
|
|
|
| 44 |
Assembly of roofing (slate) |
m2 |
|
|
|
|
| 45 |
Assembly of roofing (roll) |
m2 |
|
|
|
|
| 46 |
Installation of chimney (ventilation, 1 vent) |
m |
|
|
|
|
| 47 |
Installation of chimney (ventilation, 2 vents) |
m |
|
|
|
|
| 48 |
Installation of chimney (ventilation, 3 vents) |
m |
|
|
|
|
| 49 |
Installation of chimney (ventilation, 4 vents) |
m |
|
|
|
|
| 50 |
Installation of chimney (ventilation, 5 vents) |
m |
|
|
|
|
| 51 |
Assembly of plastering angle |
m |
|
|
|
|
| 52 |
Plastering (lime wash) |
m2 |
|
|
|
|
| 53 |
Plastering (plaster solution) |
m2 |
|
|
|
|
| 54 |
Plastering (mortar) |
m2 |
|
|
|
|
| 55 |
Facade thermal insulation (wool) |
m2 |
|
|
|
|
| 56 |
Facade thermal insulation (polystyrene) |
m2 |
|
|
|
|
| 57 |
Assembly of reinforce angles |
m |
|
|
|
|
| 58 |
Installation of reinforce layer |
m2 |
|
|
|
|
| 59 |
Installation of chimney (heating, 1 vent) |
m2 |
|
|
|
|
| 60 |
Installation of chimney (heating, 2 vents) |
m |
|
|
|
|
| 61 |
Installation of chimney flues (stainless steel) |
m |
|
|
|
|
| 62 |
Assembly of inserts |
m |
|
|
|
|
| 63 |
Installation of ventilation chimneys |
unit |
|
|
|
|
| 64 |
Assembly of window profile PVC |
m |
|
|
|
|
| 65 |
Decorative plastering |
m2 |
|
|
|
|
| 66 |
Assembly of facade boards (wood) |
m2 |
|
|
|
|
| 67 |
Assembly of facade boards (plastic) |
m2 |
|
|
|
|
| 68 |
Roof boarding (wood) |
m2 |
|
|
|
|
| 69 |
Roof boarding (perforated aluminium) |
m2 |
|
|
|
|
| 70 |
Roof boarding (steel) |
m2 |
|
|
|
|
| 71 |
Installation of exterior hydro insulation (roll) |
m2 |
|
|
|
|
| 72 |
Installation of exterior hydro insulation (composite) |
m2 |
|
|
|
|
| 73 |
Laying of facade tiles (ceramic) |
m2 |
|
|
|
|
| 74 |
Laying of facade tiles (stone) |
m2 |
|
|
|
|
| 75 |
Laying of facade tiles (clinker) |
m2 |
|
|
|
|
| 76 |
Assembly of facade tiles |
m2 |
|
|
|
|
| 77 |
Assembly of facade boards (tin) |
m2 |
|
|
|
|
| 78 |
Assembly of plastering angles |
m |
|
|
|
|
| 79 |
Surface flattening (up to 10 mm) |
m2 |
|
|
|
|
| 80 |
Surface flattening (facade up to 10 mm) |
m |
|
|
|
|
| 81 |
Assembly of plaster pasteboard frame (walls) |
m2 |
|
|
|
|
| 82 |
Assembly of plaster pasteboard frame (ceiling, one level) |
m2 |
|
|
|
|
| 83 |
Assembly of plaster pasteboard frame (ceiling, double) |
m2 |
|
|
|
|
| 84 |
Assembly of plaster pasteboard frame (decorative system) |
m |
|
|
|
|
| 85 |
Assembly of plaster pasteboards |
m2 |
|
|
|
|
| 86 |
Assembly of plaster pasteboards (damp-proof) |
m2 |
|
|
|
|
| 87 |
Assembly of sunroofs |
unit |
|
|
|
|
| 88 |
Assembly of widows (wood) |
m2 |
|
|
|
|
| 89 |
Assembly of widows (aluminium/plastic) |
m2 |
|
|
|
|
| 90 |
Assembly of windows (aluminium) |
m2 |
|
|
|
|
| 91 |
Assembly of windowsills (tin) |
m |
|
|
|
|
| 92 |
Assembly of windowsills (plastic) |
m |
|
|
|
|
| 93 |
Assembling of plaster pasteboards (decorative) |
m2 |
|
|
|
|
| 94 |
Daubing (macro) |
m2 |
|
|
|
|
| 95 |
Daubing (micro) |
m2 |
|
|
|
|
| 96 |
Decorative daubing |
m2 |
|
|
|
|
| 97 |
Impregnation of surface (facade) |
m2 |
|
|
|
|
| 98 |
Impregnation of surface |
m2 |
|
|
|
|
| 99 |
Assembly of wood particle boards |
m2 |
|
|
|
|
| 100 |
Assembly of MDF boards |
m2 |
|
|
|
|
| 101 |
Assembly of wooden fibre boards |
m2 |
|
|
|
|
| 102 |
Assembly of cement particle boards |
m2 |
|
|
|
|
| 103 |
Assembly of OSB boards (6-10 mm) |
m2 |
|
|
|
|
| 104 |
Assembly of OSB boards (12-18 mm) |
m2 |
|
|
|
|
| 105 |
Assembly of OSB boards (20-25 mm) |
m2 |
|
|
|
|
| 106 |
Foundation (facade) |
m2 |
|
|
|
|
| 107 |
Foundation |
m2 |
|
|
|
|
| 108 |
Applying of wallpaper (paper) |
m2 |
|
|
|
|
| 109 |
Applying of wallpaper (fibreglass) |
m2 |
|
|
|
|
| 110 |
Applying of wallpaper (textilic) |
m2 |
|
|
|
|
| 111 |
Applying of wallpaper (phlyseline) |
m2 |
|
|
|
|
| 112 |
Applying of wallpaper (vinyl) |
m2 |
|
|
|
|
| 113 |
Surface preparing for painting (wood) |
m2 |
|
|
|
|
| 114 |
Assembly of windowsills (mdf) |
m |
|
|
|
|
| 115 |
Assembling of windowsills (wood) |
m |
|
|
|
|
| 116 |
Painting of surface (wood) |
m2 |
|
|
|
|
| 117 |
Surface preparing for painting (metal) |
m2 |
|
|
|
|
| 118 |
Painting of surface (metal) |
m2 |
|
|
|
|
| 119 |
Painting of surface (plaster) |
m2 |
|
|
|
|
| 120 |
Painting of walls, ceilings |
m2 |
|
|
|
|
| 121 |
Decorative painting |
m2 |
|
|
|
|
| 122 |
Interior decorative plastering |
m2 |
|
|
|
|
| 123 |
Equipment of hydro insulation |
m2 |
|
|
|
|
| 124 |
Gluing of tiles (stone) |
m2 |
|
|
|
|
| 125 |
Gluing of tiles (slipware) |
m2 |
|
|
|
|
| 126 |
Gluing of tiles (small, mosaic) |
m2 |
|
|
|
|
| 127 |
Gluing of decorative stone |
m2 |
|
|
|
|
| 128 |
Installation of doors (laminated) |
unit |
|
|
|
|
| 129 |
Installation of doors (veneered) |
unit |
|
|
|
|
| 130 |
Installation of doors (massif) |
unit |
|
|
|
|
| 131 |
Installation of doors (painted) |
unit |
|
|
|
|
| 132 |
Assembly of hinges |
unit |
|
|
|
|
| 133 |
Installation of door lock |
unit |
|
|
|
|
| 134 |
Installation of weather-strips |
set |
|
|
|
|
| 135 |
Installation of floorboards (conifers) |
m2 |
|
|
|
|
| 136 |
Installation of floorboards (deciduous) |
m2 |
|
|
|
|
| 137 |
Installation of flooring (laminate) |
m2 |
|
|
|
|
| 138 |
Installation of flooring (parquet boards) |
m2 |
|
|
|
|
| 139 |
Installation of flooring (parquet) |
m2 |
|
|
|
|
| 140 |
Installation of flooring (carpeting) |
m2 |
|
|
|
|
| 141 |
Assembling of windowsills (stone) |
m |
|
|
|
|
| 142 |
Installation of thermal insulation of floors (up to 100 mm) |
m3 |
|
|
|
|
| 143 |
Installation of flooring (linoleum) |
m2 |
|
|
|
|
| 144 |
Installation of flooring (pumpable) |
m2 |
|
|
|
|
| 145 |
Installation of suspended ceiling (Armstrong) |
m2 |
|
|
|
|
| 146 |
Installation of plinths (wood) |
m |
|
|
|
|
| 147 |
Installation of plinths (plastic) |
m |
|
|
|
|
| 148 |
Installation of plinths (ceramics) |
m |
|
|
|
|
| 149 |
Installation of plinths (stone) |
m |
|
|
|
|
| 150 |
Installation of plinths (carpeting, linoleum) |
m |
|
|
|
|
| 151 |
Concrete pouring of floors (mortar) |
m3 |
|
|
|
|