Wednesday 13 November
       
Construction, finish » Finishing

Nr. Works and resource name Measures Quantity (enter) Price Sum Info
1 Assembly of plastering angle m
 
 
2 Plastering (lime wash) m2
 
 
3 Plastering (plaster solution) m2
 
 
4 Plastering (mortar) m2
 
 
5 Facade thermal insulation (wool) m2
 
 
6 Facade thermal insulation (polystyrene) m2
 
 
7 Assembly of reinforce angles m
 
 
8 Installation of reinforce layer m2
 
 
9 Assembly of window profile PVC m
 
 
10 Decorative plastering m2
 
 
11 Assembly of facade boards (wood) m2
 
 
12 Assembly of facade boards (plastic) m2
 
 
13 Roof boarding (wood) m2
 
 
14 Roof boarding (perforated aluminium) m2
 
 
15 Roof boarding (steel) m2
 
 
16 Installation of exterior hydro insulation (roll) m2
 
 
17 Installation of exterior hydro insulation (composite) m2
 
 
18 Laying of facade tiles (ceramic) m2
 
 
19 Laying of facade tiles (stone) m2
 
 
20 Laying of facade tiles (clinker) m2
 
 
21 Assembly of facade tiles m2
 
 
22 Assembly of facade boards (tin) m2
 
 
23 Assembly of plastering angles m
 
 
24 Surface flattening (up to 10 mm) m2
 
 
25 Surface flattening (facade up to 10 mm) m
 
 
26 Assembly of plaster pasteboard frame (walls) m2
 
 
27 Assembly of plaster pasteboard frame (ceiling, one level) m2
 
 
28 Assembly of plaster pasteboard frame (ceiling, double) m2
 
 
29 Assembly of plaster pasteboard frame (decorative system) m
 
 
30 Assembly of plaster pasteboards m2
 
 
31 Assembly of plaster pasteboards (damp-proof) m2
 
 
32 Assembling of plaster pasteboards (decorative) m2
 
 
33 Daubing (macro) m2
 
 
34 Daubing (micro) m2
 
 
35 Decorative daubing m2
 
 
36 Impregnation of surface (facade) m2
 
 
37 Impregnation of surface m2
 
 
38 Assembly of wood particle boards m2
 
 
39 Assembly of MDF boards m2
 
 
40 Assembly of wooden fibre boards m2
 
 
41 Assembly of cement particle boards m2
 
 
42 Assembly of OSB boards (6-10 mm) m2
 
 
43 Assembly of OSB boards (12-18 mm) m2
 
 
44 Assembly of OSB boards (20-25 mm) m2
 
 
45 Foundation (facade) m2
 
 
46 Foundation m2
 
 
47 Applying of wallpaper (paper) m2
 
 
48 Applying of wallpaper (fibreglass) m2
 
 
49 Applying of wallpaper (textilic) m2
 
 
50 Applying of wallpaper (phlyseline) m2
 
 
51 Applying of wallpaper (vinyl) m2
 
 
52 Surface preparing for painting (wood) m2
 
 
53 Painting of surface (wood) m2
 
 
54 Surface preparing for painting (metal) m2
 
 
55 Painting of surface (metal) m2
 
 
56 Painting of surface (plaster) m2
 
 
57 Painting of walls, ceilings m2
 
 
58 Decorative painting m2
 
 
59 Interior decorative plastering m2
 
 
60 Equipment of hydro insulation m2
 
 
61 Gluing of tiles (stone) m2
 
 
62 Gluing of tiles (slipware) m2
 
 
63 Gluing of tiles (small, mosaic) m2
 
 
64 Gluing of decorative stone m2
 
 
65 Installation of doors (laminated) unit
 
 
66 Installation of doors (veneered) unit
 
 
67 Installation of doors (massif) unit
 
 
68 Installation of doors (painted) unit
 
 
69 Assembly of hinges unit
 
 
70 Installation of door lock unit
 
 
71 Installation of weather-strips set
 
 
72 Installation of floorboards (conifers) m2
 
 
73 Installation of floorboards (deciduous) m2
 
 
74 Installation of flooring (laminate) m2
 
 
75 Installation of flooring (parquet boards) m2
 
 
76 Installation of flooring (parquet) m2
 
 
77 Installation of flooring (carpeting) m2
 
 
78 Installation of flooring (linoleum) m2
 
 
79 Installation of flooring (pumpable) m2
 
 
80 Installation of suspended ceiling (Armstrong) m2
 
 
81 Installation of plinths (wood) m
 
 
82 Installation of plinths (plastic) m
 
 
83 Installation of plinths (ceramics) m
 
 
84 Installation of plinths (stone) m
 
 
85 Installation of plinths (carpeting, linoleum) m
 
 
Works price
Find out price