Construction, finish » Finishing
----Choose---
Domestic works
External works
Nr.
Works and resource name
Measures
Quantity (enter)
Price
Sum
Info
1
Assembly of plastering angle
m
3.19
2
Plastering (lime wash)
m2
6.37
3
Plastering (plaster solution)
m2
6.95
4
Plastering (mortar)
m2
8.11
5
Facade thermal insulation (wool)
m2
8.98
6
Facade thermal insulation (polystyrene)
m2
7.53
7
Assembly of reinforce angles
m
3.48
8
Installation of reinforce layer
m2
4.63
9
Assembly of window profile PVC
m
2.90
10
Decorative plastering
m2
9.56
11
Assembly of facade boards (wood)
m2
11.01
12
Assembly of facade boards (plastic)
m2
9.27
13
Roof boarding (wood)
m2
13.90
14
Roof boarding (perforated aluminium)
m2
17.09
15
Roof boarding (steel)
m2
16.80
16
Installation of exterior hydro insulation (roll)
m2
18.54
17
Installation of exterior hydro insulation (composite)
m2
16.22
18
Laying of facade tiles (ceramic)
m2
13.32
19
Laying of facade tiles (stone)
m2
15.06
20
Laying of facade tiles (clinker)
m2
21.72
21
Assembly of facade tiles
m2
13.61
22
Assembly of facade boards (tin)
m2
10.43
23
Assembly of plastering angles
m
2.32
24
Surface flattening (up to 10 mm)
m2
5.21
25
Surface flattening (facade up to 10 mm)
m
5.50
26
Assembly of plaster pasteboard frame (walls)
m2
3.77
27
Assembly of plaster pasteboard frame (ceiling, one level)
m2
4.05
28
Assembly of plaster pasteboard frame (ceiling, double)
m2
4.63
29
Assembly of plaster pasteboard frame (decorative system)
m
12.16
30
Assembly of plaster pasteboards
m2
3.19
31
Assembly of plaster pasteboards (damp-proof)
m2
3.19
32
Assembling of plaster pasteboards (decorative)
m2
5.50
33
Daubing (macro)
m2
4.34
34
Daubing (micro)
m2
4.63
35
Decorative daubing
m2
8.11
36
Impregnation of surface (facade)
m2
3.48
37
Impregnation of surface
m2
3.19
38
Assembly of wood particle boards
m2
4.63
39
Assembly of MDF boards
m2
6.08
40
Assembly of wooden fibre boards
m2
5.21
41
Assembly of cement particle boards
m2
6.66
42
Assembly of OSB boards (6-10 mm)
m2
4.92
43
Assembly of OSB boards (12-18 mm)
m2
6.37
44
Assembly of OSB boards (20-25 mm)
m2
8.40
45
Foundation (facade)
m2
1.16
46
Foundation
m2
0.87
47
Applying of wallpaper (paper)
m2
2.61
48
Applying of wallpaper (fibreglass)
m2
2.61
49
Applying of wallpaper (textilic)
m2
4.05
50
Applying of wallpaper (phlyseline)
m2
3.48
51
Applying of wallpaper (vinyl)
m2
2.90
52
Surface preparing for painting (wood)
m2
12.74
53
Painting of surface (wood)
m2
6.37
54
Surface preparing for painting (metal)
m2
13.61
55
Painting of surface (metal)
m2
5.50
56
Painting of surface (plaster)
m2
4.63
57
Painting of walls, ceilings
m2
5.21
58
Decorative painting
m2
5.79
59
Interior decorative plastering
m2
13.90
60
Equipment of hydro insulation
m2
12.16
61
Gluing of tiles (stone)
m2
11.30
62
Gluing of tiles (slipware)
m2
10.72
63
Gluing of tiles (small, mosaic)
m2
19.69
64
Gluing of decorative stone
m2
13.90
65
Installation of doors (laminated)
unit
25.49
66
Installation of doors (veneered)
unit
27.51
67
Installation of doors (massif)
unit
40.55
68
Installation of doors (painted)
unit
36.20
69
Assembly of hinges
unit
8.69
70
Installation of door lock
unit
24.91
71
Installation of weather-strips
set
14.48
72
Installation of floorboards (conifers)
m2
13.32
73
Installation of floorboards (deciduous)
m2
16.22
74
Installation of flooring (laminate)
m2
8.40
75
Installation of flooring (parquet boards)
m2
10.72
76
Installation of flooring (parquet)
m2
18.25
77
Installation of flooring (carpeting)
m2
4.63
78
Installation of flooring (linoleum)
m2
5.79
79
Installation of flooring (pumpable)
m2
11.58
80
Installation of suspended ceiling (Armstrong)
m2
5.50
81
Installation of plinths (wood)
m
2.61
82
Installation of plinths (plastic)
m
2.32
83
Installation of plinths (ceramics)
m
5.21
84
Installation of plinths (stone)
m
10.14
85
Installation of plinths (carpeting, linoleum)
m
2.32
Works price
Find out price
Remove